Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 27, 2018, 08:44 AM
  • 32 1167_32 1166_27072018_015242.mp4

Date
07/27/2018
W/O
717961
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00839
PipeID
P19621
Time
1:44 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5882
Sewer Name
32 SAN FERNANDO ROAD TRUNK
City
SANTA CLARITA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 32
Page No.
09
Purpose
Routine Assessment
Project
WO_717961_TV32021_AUG2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
32 1167
Downstream MH
32 1166
Dir. of Survey
Downstream
Length Surveyed
116.1 ft.
Total Length
116.1 ft.
Structural Index
3
Structural Quick
3D00
Structural Rating
69
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
3
Overall Quick
Overall Rating
115
Pipe schematic from manhole 32 1167 to 32 1166
MH: 32 1167MH: 32 1166downstream0 ft. AMH - Upstream Manhole, Survey Begins - 32 11670 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.2 ft. MGO - General Observation - MAG COATING 60%104.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"115.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish115.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish116.1 ft. AMH - Downstream Manhole, Survey Ends - 32 1166

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
115.9SAP
2DAGS
116.1AMH32 1166
0AMH32 1167
115.9DAGS
9.2MGOMAG COATING 60%
0MWL
2SAP
104.1TFC
0MWM

Properties (4)

additional_info
SC359750
custom_field_two
2
customer
LACSD
datetime
2018-07-27T01:44:24-07:00