Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 31, 2018, 07:10 AM
  • F 0147_F 0333 _31072018_004851.mp4

Date
07/31/2018
W/O
717866
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00037
PipeID
P26386
Time
12:10 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5801
Sewer Name
F JOINT OUTFALL F - UNIT 3B
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39
Purpose
Routine Assessment
Project
WO_717866_TV02231_AUG2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
F 0147
Downstream MH
F 0333
Dir. of Survey
Downstream
Length Surveyed
620.2 ft.
Total Length
620.2 ft.
Structural Index
4
Structural Quick
5X3X
Structural Rating
992
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
992
Pipe schematic from manhole F 0147 to F 0333
MH: F 0147MH: F 0333downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01470 ft. MWL - Water Level, 25 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start103.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6", 6"305.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"619.8 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish619.8 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK619.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish620.2 ft. AMH - Downstream Manhole, Survey Ends - F 0333

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
2.1SAP
620.2AMHF 0333
0MWM
619.8SRV
103.6TFC
619.8MGOCONNECTION AT MH 9 O'CLOCK
619.8SAP
0AMHF 0147
2.1SRV
305.6TFC
0MWL

Properties (4)

additional_info
SC364714
custom_field_two
2
customer
LACSD
datetime
2018-07-31T00:10:45-07:00