Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 31, 2018, 06:05 AM
  • F 0148_F 0147 _30072018_233916.mp4

Date
07/30/2018
W/O
717866
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00037
PipeID
P10180
Time
11:05 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5801
Sewer Name
F JOINT OUTFALL F - UNIT 3B
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
39A
Purpose
Routine Assessment
Project
WO_717866_TV02231_AUG2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Width
63 in.
Upstream MH
F 0148
Downstream MH
F 0147
Dir. of Survey
Downstream
Length Surveyed
731.9 ft.
Total Length
731.9 ft.
Structural Index
4
Structural Quick
5Z3\
Structural Rating
1113
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
1113
Pipe schematic from manhole F 0148 to F 0147
MH: F 0148MH: F 0147downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01482.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start29.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start157.5 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish157.5 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start293.2 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish320.6 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start546.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"692.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"731.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish731.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish731.9 ft. AMH - Downstream Manhole, Survey Ends - F 0147

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    29.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    157.5 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    320.6 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
731.8SRV
29.5SRV
0MWM
0MWL
157.5SRV
157.5SRC
320.6SRV
731.8SAP
692.4TF
0AMHF 0148
2.1SAP
546.5TF
293.2SRC
731.9AMHF 0147

Properties (4)

additional_info
SC364714
custom_field_two
2
customer
LACSD
datetime
2018-07-30T23:05:33-07:00