Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2018, 05:47 AM
  • 29 0202_29 0201 _25072018_230958.mpg

Date
07/25/2018
W/O
717713
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z01025
PipeID
P24101
Time
10:47 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5323
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_717713_TV29056_AUG2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0202
Downstream MH
29 0201
Dir. of Survey
Downstream
Length Surveyed
313.1 ft.
Total Length
313.2 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 29 0202 to 29 0201
MH: 29 0202MH: 29 0201downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 02020 ft. MGO - General Observation - CONNECTION IN MH AT 3 OCLOCK0 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES0 ft. MWM - Water Mark, 5 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area68.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"72.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"116.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"118.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"169.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"171.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"219.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"220.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"267.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"271.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"313.2 ft. AMH - Downstream Manhole, Survey Ends - 29 0201

Observation photos (1)

  • Deposits Settled Compacted,  10 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES

    0 ft. - Deposits Settled Compacted, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
169.9TFC
0AMH29 0202
0MGOCONNECTION IN MH AT 3 OCLOCK
0DSC
313.2AMH29 0201
118.6TFC
0MWM
0MWL
116.6TFC
271.5TFC
72.3TFA
220.1TFA
171.4TFC
267.3TFC
219.4TFA
68.9TFC

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-07-25T22:47:34-07:00