Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2018, 06:36 AM
  • 29 0303_29 0302 _24072018_235152.mpg

Date
07/24/2018
W/O
717713
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z01025
PipeID
P24315
Time
11:36 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5322
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_717713_TV29056_AUG2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0302
Downstream MH
29 0303
Dir. of Survey
Upstream
Length Surveyed
331.9 ft.
Total Length
331.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0302 to 29 0303
MH: 29 0302MH: 29 0303upstream0 ft. AMH - Upstream Manhole, Survey Ends - 29 03030.1 ft. MGO - General Observation - AGGREGATE PROJECTING IN CHANNEL AT MH47.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"50.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"67.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"99.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"102.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"151 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"154 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"202.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"205.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"249.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"252.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"296.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"299.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6"331.9 ft. AMH - Downstream Manhole, Survey Begins - 29 0302331.9 ft. MWM - Water Mark, 10 %of cross sectional area331.9 ft. MWL - Water Level, 5 %of cross sectional area331.9 ft. MGO - General Observation - AGGREGATE PROJECTING IN CHANNEL

Observation photos (2)

  • General Observation - AGGREGATE PROJECTING IN CHANNEL

    0 ft. - General Observation - AGGREGATE PROJECTING IN CHANNEL

  • General Observation - AGGREGATE PROJECTING IN CHANNEL AT MH

    331.8 ft. - General Observation - AGGREGATE PROJECTING IN CHANNEL AT MH

Observations (19)

DistanceCodeObservation
180.9TFC
79.1TFC
229.7TFC
331.9AMH29 0303
126.4TFC
0AMH29 0302
0MWM
232.7TFC
264.2TFA
0MWL
32.5TF
284.6TFC
0MGOAGGREGATE PROJECTING IN CHANNEL
35.5TFA
331.8MGOAGGREGATE PROJECTING IN CHANNEL AT MH
177.9TFC
82.5TFC
129.5TFC
281.5TFC

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2018-07-24T23:36:46-07:00