Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 25, 2018, 05:44 AM
  • 29 0302_29 0301 _24072018_230517.mpg

Date
07/24/2018
W/O
717713
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z01025
PipeID
P24314
Time
10:44 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5322
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
02
Purpose
Routine Assessment
Project
WO_717713_TV29056_AUG2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0302
Downstream MH
29 0301
Dir. of Survey
Downstream
Length Surveyed
340.5 ft.
Total Length
340.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole 29 0302 to 29 0301
MH: 29 0302MH: 29 0301downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 030276.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"80 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"128.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"131.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"181 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"183.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"227.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"230 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"279 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"281.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"330.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"333.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"338 ft. MGO - General Observation - CHANNEL CORRODED AGGREGATE PROJECTING340.5 ft. AMH - Downstream Manhole, Survey Ends - 29 0301

Observation photos (1)

  • General Observation - CHANNEL CORRODED AGGREGATE PROJECTING

    338 ft. - General Observation - CHANNEL CORRODED AGGREGATE PROJECTING

Observations (17)

DistanceCodeObservation
340.5AMH29 0301
338MGOCHANNEL CORRODED AGGREGATE PROJECTING
281.8TFC
0MWL
279TFC
128.3TFC
0MWM
131.6TFA
230TFC
333.6TFA
183.3TFC
181TFA
76.5TFC
227.5TFC
330.2TFC
80TFC
0AMH29 0302

Properties (4)

additional_info
SC362732
custom_field_two
2
customer
LACSD
datetime
2018-07-24T22:44:01-07:00