Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 26, 2018, 05:30 AM
  • 29 0203_29 0202 _25072018_224602.mpg

Date
07/25/2018
W/O
717713
Weather
Dry
Operator/Surveyor
E.RUIZ
Sewer ID
Z01025
PipeID
P24102
Time
10:30 PM
Certificate
U-715-07000753
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5323
Sewer Name
29 28TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
WO_717713_TV29056_AUG2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
29 0203
Downstream MH
29 0202
Dir. of Survey
Downstream
Length Surveyed
294.7 ft.
Total Length
294.7 ft.
Structural Index
2
Structural Quick
3211
Structural Rating
7
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 29 0203 to 29 0202
MH: 29 0203MH: 29 0202downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 02030 ft. MWM - Water Mark, 5 %of cross sectional area15.2 ft. JOM - Joint Offset Medium16.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"29 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"30.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"41.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"78.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"80.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"124.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"126.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"176.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"179.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"226.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"228.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"276.4 ft. CM - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES281.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"282.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"284.1 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES294.7 ft. MGO - General Observation - CONNECTION IN MH 3 OCLOCK294.7 ft. AMH - Downstream Manhole, Survey Ends - 29 0202

Observation photos (3)

  • Joint Offset Medium

    15.2 ft. - Joint Offset Medium

  • Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

    276.4 ft. - Crack Multiple, from 07 to 04 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    284.1 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
294.7MGOCONNECTION IN MH 3 OCLOCK
126.1TFC
0MWL
294.7AMH29 0202
282.8TFC
284.1CM
226.4TFC
30.5TFC
16.8TFA
281.3TFC
41.8TFA
124.6TFC
78.5TFC
15.2JOM
80.2TFC
176.8TFC
0AMH29 0203
276.4CM
179.4TFC
0MWM
29TFC
228.8TFC

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2018-07-25T22:30:42-07:00