Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 3, 2018, 08:59 AM
  • H 0728_H 0727A _03072018_021846.mp4

Date
07/03/2018
W/O
712465
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00941
PipeID
P21324
Time
1:59 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5764
Sewer Name
H JOINT OUTFALL H - UNIT 9B
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
30
Purpose
Routine Assessment
Project
WO_712465_TV22077_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
28 in.
Width
28 in.
Upstream MH
H 0728
Downstream MH
H 0727A
Dir. of Survey
Downstream
Length Surveyed
565.3 ft.
Total Length
565.3 ft.
Structural Index
3
Structural Quick
3V00
Structural Rating
342
O&M Index
2
O&M Quick
2Q00
O&M Rating
182
Overall Index
3
Overall Quick
Overall Rating
524
Pipe schematic from manhole H 0728 to H 0727A
MH: H 0728MH: H 0727Adownstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 07280 ft. MWM - Water Mark, 20 %of cross sectional area2.5 ft. MGO - General Observation - MAG COAT2.5 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start51.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"51.5 ft. SAP - Surface Aggregate Projecting, from 07 to 10 o'clock, within 8 inches of joint: NO104.3 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start560.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish565.3 ft. AMH - Downstream Manhole, Survey Ends - H 0727A565.3 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish

Observation photos (3)

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.5 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 07 to 10 o'clock, within 8 inches of joint: NO

    51.5 ft. - Surface Aggregate Projecting, from 07 to 10 o'clock, within 8 inches of joint: NO

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    104.3 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
565.3AMHH 0727A
565.3SAV
560.8DSZ
2.5MGOMAG COAT
0MWL
0AMHH 0728
104.3DSZ
0MWM
51.5TF
2.5SAV
51.5SAP

Properties (4)

additional_info
SC359673
custom_field_two
3
customer
LACSD
datetime
2018-07-03T01:59:37-07:00