Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2018, 05:05 AM
  • 08 0214_08 0213 _17072018_222319.mp4

Date
07/17/2018
W/O
712106
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00005
PipeID
P00084
Time
10:05 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5870
Sewer Name
08 EAST ROAD TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_712106_TV08112_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
08 0214
Downstream MH
08 0213
Dir. of Survey
Downstream
Length Surveyed
351.8 ft.
Total Length
351.8 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 08 0214 to 08 0213
MH: 08 0214MH: 08 0213downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 02140 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"5.2 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start79.1 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"125.8 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish154.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"188.6 ft. MWL - Water Level, 50 %of cross sectional area232.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"308.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"350 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish350 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish351.8 ft. AMH - Downstream Manhole, Survey Ends - 08 0213

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
351.8AMH08 0213
5.2FH2
154.4TFC
5.2CM
350CM
79.1TFA
0AMH08 0214
308.7TFC
350DAGS
2DAGS
125.8FH2
4TFC
0MWL
188.6MWL
0MWM
232.8TFA

Properties (4)

additional_info
SC359738
custom_field_two
2
customer
LACSD
datetime
2018-07-17T22:05:09-07:00