Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2018, 08:29 AM
  • 08 0231_08 0230 _18072018_014652.mp4

Date
07/18/2018
W/O
712106
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00005
PipeID
P00105
Time
1:29 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5870
Sewer Name
08 EAST ROAD TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_712106_TV08112_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
08 0231
Downstream MH
08 0230
Dir. of Survey
Downstream
Length Surveyed
353.7 ft.
Total Length
353.7 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 08 0231 to 08 0230
MH: 08 0231MH: 08 0230downstream0 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 AND 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 02312 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start4.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start76.1 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"79.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"85.8 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start135.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"241.5 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"337.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"352 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish352 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish352 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish353.7 ft. AMH - Downstream Manhole, Survey Ends - 08 0230353.7 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    4.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    85.8 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
85.8FH2
353.7AMH08 0230
352CM
0MGOCAPPED CONNECTION AT MH 3 AND 9 O'CLOCK
241.5TFA
352FH2
4.4CM
2DAGS
0MWL
352DAGS
0MWM
79.5TFC
0AMH08 0231
135.8TFA
353.7MGOCAPPED CONNECTION AT MH 9 O'CLOCK
337.8TFA
76.1TBA

Properties (4)

additional_info
SC359738
custom_field_two
2
customer
LACSD
datetime
2018-07-18T01:29:19-07:00