08 0218_08 0217 _17072018_030731.mp4
2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
6 ft. - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES
23.6 ft. - Crack Multiple, from 12 to 12 o'clock, within 8 inches of joint: YES, Start
43 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
105.3 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES
284.9 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 334.2 | TFC | — |
| 43 | DAE | — |
| 106.4 | TFA | — |
| 421.5 | MGO | CAPPED CONNECTION AT MH 3 AND 9 O'CLOCK |
| 36.6 | TFC | — |
| 105.3 | DAGS | — |
| 122.1 | DAE | — |
| 418.3 | FH2 | — |
| 418.3 | DAGS | — |
| 0 | MWL | — |
| 23.6 | CM | — |
| 408.6 | TFC | — |
| 0 | MGO | ACTIVE CONNECTION AT MH 9 O'CLOCK |
| 421.5 | AMH | 08 0217 |
| 257.5 | TFA | — |
| 0 | MWM | — |
| 284.9 | FH2 | — |
| 6 | CM | — |
| 418.3 | CM | — |
| 0 | AMH | 08 0218 |
| 182.7 | TFC | — |
| 2 | DAGS | — |