Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2018, 07:31 AM
  • 08 0227_08 0226_18072018_004336.mp4

Date
07/18/2018
W/O
712106
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00005
PipeID
P00101
Time
12:31 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5870
Sewer Name
08 EAST ROAD TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_712106_TV08112_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Width
8 in.
Upstream MH
08 0227
Downstream MH
08 0226
Dir. of Survey
Downstream
Length Surveyed
136.5 ft.
Total Length
136.5 ft.
Structural Index
4
Structural Quick
4131
Structural Rating
7
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 08 0227 to 08 0226
MH: 08 0227MH: 08 0226downstream0 ft. AMH - Upstream Manhole, Survey Begins - 08 02270 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 35 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start34.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"54.5 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"99.3 ft. FH2 - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, 6"113.8 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"135.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish135.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish136.5 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK136.5 ft. AMH - Downstream Manhole, Survey Ends - 08 0226

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    34.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, 6"

    99.3 ft. - Fracture Longitudinal Hinge, 2, from 09 to 03 o'clock, within 8 inches of joint: YES, 6"

Observations (14)

DistanceCodeObservation
136.5MGOCAPPED CONNECTION AT MH 3 O'CLOCK
135.6CM
99.3FH2
0AMH08 0227
34.5CM
2DAGS
135.6DAGS
136.5AMH08 0226
0MWM
113.8TFA
54.5TBA
45.1TFC
0MGOCAPPED CONNECTION AT MH 3 O'CLOCK
0MWL

Properties (4)

additional_info
SC359738
custom_field_two
3
customer
LACSD
datetime
2018-07-18T00:31:32-07:00