Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 30, 2018, 07:51 AM
  • Section#1_16 0178_16 0177__7302018__ I0045.mp4

Date
07/30/2018
W/O
#
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00648
PipeID
P13210
Time
12:51 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0045
Sewer Name
16 ARROYO SECO TRUNK, SECTION 5
City
PASADENA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
17
Purpose
Routine Assessment
Project
20180730MDM_ARROYO_SECO_TRUNK_SECTION_5
Material
Vitrified Clay Pipe
Shape
Circular
Height
16 in.
Upstream MH
16 0178
Downstream MH
16 0177
Dir. of Survey
Downstream
Length Surveyed
228.1 ft.
Total Length
228.1 ft.
Structural Index
2
Structural Quick
3324
Structural Rating
17
O&M Index
3
O&M Quick
3200
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
23
Pipe schematic from manhole 16 0178 to 16 0177
MH: 16 0178MH: 16 0177downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:55AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - MH CONN 9:00 ACTIVE0 ft. MWM - Water Mark, 40 %of cross sectional area3 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - SLIGHT8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - ACTIVE31.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - SLIGHT31.4 ft. RMJ - Roots Medium Joint, from 08 to 10 o'clock, 5 %, within 8 inches of joint: YESR33 ft. FC - Fracture Circumferential, from 09 to 11 o'clock, within 8 inches of joint: YES - SLIGHT40.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN54.8 ft. MGO - General Observation - 16" VCP63.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN63.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN78.4 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - HAIRLINE84.5 ft. FL - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES - SL132.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN132.6 ft. MGO - General Observation - 16" VCP160.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN167.5 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - SLIGHT178.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - OPEN189 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN215.6 ft. FL - Fracture Longitudinal, at 11 o'clock, within 8 inches of joint: YES - SL220.7 ft. RMJ - Roots Medium Joint, from 08 to 12 o'clock, 10 %, within 8 inches of joint: YESR228.1 ft. AMH - Downstream Manhole, Survey Ends - 1:50AM

Observation photos (2)

  • General Observation - 16" VCP

    54.8 ft. - General Observation - 16" VCP

  • General Observation - 16" VCP

    132.6 ft. - General Observation - 16" VCP

Observations (24)

DistanceCodeObservation
33FCSLIGHT
31.4FLSLIGHT
8TFACTIVE
0AMH12:55AM
31.4RMJ
178.8TFOPEN
40.2TFOPEN
63.6TFOPEN
228.1AMH1:50AM
54.8MGO16" VCP
132.6TFOPEN
215.6FLSL
78.4FCHAIRLINE
189TFOPEN
84.5FLSL
63.6TFOPEN
220.7RMJ
3FCSLIGHT
132.6MGO16" VCP
0MWL
167.5FCSLIGHT
0MGOMH CONN 9:00 ACTIVE
0MWM
160.1TFOPEN

Properties (4)

custom_field_three
SLIGHT FRACTURES
custom_field_two
4
customer
LACSD
datetime
2018-07-30T00:51:11-07:00