Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 6, 2017, 06:12 AM
  • 02 1659_02 1658_05072017_232442.mp4

Date
07/05/2017
W/O
613355
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00289
PipeID
P18815
Time
11:12 PM
Certificate
U-115-06022794
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3980-SC342143
Sewer Name
02 MONTEREY PARK EXTENSION TRUNK
City
MONTEREY PARK
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
WO_613355_TV02105_JUN2017
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1659
Downstream MH
02 1658
Dir. of Survey
Downstream
Length Surveyed
119.3 ft.
Total Length
119.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 02 1659 to 02 1658
MH: 02 1659MH: 02 1658downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 16593 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start10.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"46.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"84.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6"86.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6"100.5 ft. MMC - Material Change, Concrete pipe (non-reinfored)100.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish100.5 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start116.8 ft. SAV - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Finish117.6 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK119.3 ft. AMH - Downstream Manhole, Survey Ends - 02 1658

Observation photos (2)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

    100.5 ft. - Surface Aggregate Visible, from 12 to 12 o'clock, within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
119.3AMH02 1658
86.9TFC
0MWL
100.5MMC
0MWM
84.5TB
0AMH02 1659
3DAGS
116.8SAV
100.5DAGS
100.5SAV
46.6TFC
10.5TFC
117.6MGOCONNECTION AT MH 3 OCLOCK

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-07-05T23:12:04-07:00