Section#8_G 0136_G 0135__7242018__ I0039.mp4
2 ft. - General Observation - TILES 100% MISSING 10:00 TO 2:00
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING CONCRETE
2 ft. - General Observation - MAG COAT 40% START 10:00 TO 2:00
2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
22.2 ft. - Surface Aggregate Missing, from 11 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
39 ft. - Surface Aggregate Missing, from 12 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG
39 ft. - Deposits Settled Other, 40 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO - MISSING TILES
40.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 02 o'clock, , within 8 inches of joint: YES, Start
67.5 ft. - General Observation - 95% MISSING TILES 9:00 TO 3:00
67.5 ft. - General Observation - MAG COAT 60% START
67.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
67.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SWOLLEN BLISTERING CONCRETE
77.1 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: NO,
213.3 ft. - Surface Aggregate Missing, from 09 to 12 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 2 | MGO | TILES 100% MISSING 10:00 TO 2:00 |
| 39 | SAM | SEVERE AGG |
| 324.7 | AMH | 5:45AM |
| 213.3 | SAM | SEVERE AGG |
| 106.4 | DSZ | MISSING TILES |
| 324.2 | DAGS | — |
| 324.2 | SSS | SWOLLEN BLISTERING CONCRETE |
| 0 | MWM | — |
| 22.2 | SAM | SEVERE AGG |
| 67.5 | MGO | 95% MISSING TILES 9:00 TO 3:00 |
| 67.5 | SAM | SEVERE AGG |
| 39 | DSZ | MISSING TILES |
| 67.5 | SSS | SWOLLEN BLISTERING CONCRETE |
| 324.2 | MGO | MISSING TILES 95% FINISH 9:00 TO 3:00 |
| 0 | AMH | 4:45AM |
| 324.2 | DSZ | MISSING TILES |
| 67.5 | MWM | — |
| 67.5 | MGO | MAG COAT 60% START |
| 2 | DAGS | — |
| 324.2 | SAM | SEVERE AGG |
| 324.2 | MGO | MAG COAT 60% FINISH |
| 67.5 | DSZ | MISSING TILES |
| 40.6 | DAGS | — |
| 2 | SSS | SWOLLEN BLISTERING CONCRETE |
| 67.5 | SAM | SEVERE AGG |
| 2 | MGO | MAG COAT 40% START 10:00 TO 2:00 |
| 295.9 | DSZ | MISSING TILES |
| 2 | SAM | SEVERE AGG |
| 53 | DAGS | — |
| 77.1 | DAGS | — |
| 67.5 | SSS | SWOLLEN BLISTERING CONCRETE |
| 55.8 | DAGS | — |
| 0 | MWL | — |
| 67.5 | MWL | — |