Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 23, 2018, 10:26 AM
  • Section#5_G 0154_G 0153__7232018__ I0037.mp4

Date
07/23/2018
W/O
0711987
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P01477
Time
3:26 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0038
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
17
Purpose
Capital Improvement Program Assesment
Project
20180723MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0154
Downstream MH
G 0153
Dir. of Survey
Downstream
Length Surveyed
10.7 ft.
Total Length
10.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
6
Pipe schematic from manhole G 0154 to G 0153
MH: G 0154MH: G 0153downstream0 ft. MGO - General Observation - MH CONN 9:00 STUB0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:50AM0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - MH CONN 6:00 ACTIVE0 ft. MGO - General Observation - MAG COAT 100% START2 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - TILES 100% IN PLACE UNDER MAG & GREASE COAT2 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO - SLUDGE10.1 ft. MGO - General Observation - TILES 100% IN PLACE UNDER MAG & GREASE COAT10.1 ft. MGO - General Observation - MH CONN 9:00 ACTIVE10.1 ft. DAGS - Deposits Attached Grease, 2 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish10.1 ft. MGO - General Observation - MAG COAT 100% FINISH10.7 ft. AMH - Downstream Manhole, Survey Ends - 6:00

Observation photos (4)

  • General Observation - MAG COAT 100% START

    0 ft. - General Observation - MAG COAT 100% START

  • Deposits Attached Grease, 2 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 2 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - TILES 100% IN PLACE UNDER MAG & GREASE COAT

    2 ft. - General Observation - TILES 100% IN PLACE UNDER MAG & GREASE COAT

  • Deposits Settled Other,  10 %of cross sectional area, from 04 to 05 o'clock,  , within 8 inches of joint: NO - SLUDGE

    2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 04 to 05 o'clock, , within 8 inches of joint: NO - SLUDGE

Observations (14)

DistanceCodeObservation
2DAGS
0MGOMH CONN 9:00 STUB
2MGOTILES 100% IN PLACE UNDER MAG & GREASE COAT
0MWM
10.1MGOTILES 100% IN PLACE UNDER MAG & GREASE COAT
0AMH5:50AM
0MWL
10.7AMH6:00
0MGOMH CONN 6:00 ACTIVE
0MGOMAG COAT 100% START
10.1MGOMH CONN 9:00 ACTIVE
2DSZSLUDGE
10.1DAGS
10.1MGOMAG COAT 100% FINISH

Properties (4)

custom_field_three
TILES 100% IN PLACE UNDER MAG & GREASE COAT
custom_field_two
3
customer
LACSD
datetime
2018-07-23T03:26:44-07:00