Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 26, 2018, 07:49 AM
  • B 0358_B 0357 _26062018_010222.mp4

Date
06/26/2018
W/O
712401
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00091
PipeID
P08870
Time
12:49 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5705
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_712401_TV15051_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0358
Downstream MH
B 0357
Dir. of Survey
Downstream
Length Surveyed
342.3 ft.
Total Length
342.3 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
340
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
340
Pipe schematic from manhole B 0358 to B 0357
MH: B 0358MH: B 0357downstream0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03582.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start341.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish341.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish341.5 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK342.3 ft. AMH - Downstream Manhole, Survey Ends - B 0357342.3 ft. MGO - General Observation - CAPPED LATERAL 9 O'CLOCK @ MH

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
342.3AMHB 0357
0MWM
2.6SAP
341.5SAP
342.3MGOCAPPED LATERAL 9 O'CLOCK @ MH
341.5SSS
0MWL
0AMHB 0358
341.5MGOCONNECTION AT MH 3 O'CLOCK
2.6SSS

Properties (4)

additional_info
SC359663
custom_field_two
3
customer
LACSD
datetime
2018-06-26T00:49:40-07:00