Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 25, 2018, 09:42 AM
  • B 0369_B 0368 _25062018_024947.mp4

Date
06/25/2018
W/O
712401
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00091
PipeID
P08881
Time
2:42 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5704
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
10
Purpose
Routine Assessment
Project
WO_712401_TV15051_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
B 0369
Downstream MH
B 0368
Dir. of Survey
Downstream
Length Surveyed
236.4 ft.
Total Length
236.4 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole B 0369 to B 0368
MH: B 0369MH: B 0368downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - B 03690 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0.1 ft. MWM - Water Mark, 35 %of cross sectional area3.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start236.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236.4 ft. MGO - General Observation - CAPPED CONNECTION AT 9 O' CLOCK AT236.4 ft. AMH - Downstream Manhole, Survey Ends - B 0368236.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish236.4 ft. MGO - General Observation - CAPPED CONNECTION AT 3 O' CLOCK AT MH

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0.1MWM
0MWL
0AMHB 0369
236.4SSS
3.3SAP
236.4MGOCAPPED CONNECTION AT 9 O' CLOCK AT
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
236.4AMHB 0368
3.4SSS
236.4SAP
236.4MGOCAPPED CONNECTION AT 3 O' CLOCK AT MH

Properties (4)

additional_info
SC359662
custom_field_two
3
customer
LACSD
datetime
2018-06-25T02:42:20-07:00