Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 18, 2018, 10:16 AM
  • Section#1_G 0165_G 0164__7182018__I0035.mp4

Date
07/18/2018
W/O
0711987
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z01180
PipeID
P00846
Time
3:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
I0035
Sewer Name
G JOINT OUTFALL G - UNIT 8
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Capital Improvement Program Assesment
Project
20180718MDM_JOINT_OUTFALL_G_UNIT_8
Material
RCP-CTL
Shape
Circular
Height
36 in.
Upstream MH
G 0165
Downstream MH
G 0164
Dir. of Survey
Downstream
Length Surveyed
347.7 ft.
Total Length
347.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2R00
O&M Rating
188
Overall Index
2
Overall Quick
Overall Rating
188
Pipe schematic from manhole G 0165 to G 0164
MH: G 0165MH: G 0164downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM0 ft. MGO - General Observation - MH CONN 6:00 ACTIVE0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - TILES 100% IN PLACE START25.3 ft. MGO - General Observation - MAG COAT 70% START33.9 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE74.9 ft. MGO - General Observation - MAG COAT 90% START159.8 ft. DSZ - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - DEBRIE ROCKS249.4 ft. MGO - General Observation - TILES APPEAR 100% IN PLACE UNDER MAG COAT347.1 ft. MGO - General Observation - MH CONN 3:00 ACTIVE347.1 ft. MGO - General Observation - TILES100% IN PLACE UNDER MAG & GREASE COAT347.1 ft. MGO - General Observation - MAG COAT 90% FINISH347.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish347.7 ft. AMH - Downstream Manhole, Survey Ends - 4:35AM

Observation photos (5)

  • General Observation - TILES 100% IN PLACE START

    2 ft. - General Observation - TILES 100% IN PLACE START

  • General Observation - MAG COAT 70% START

    25.3 ft. - General Observation - MAG COAT 70% START

  • Deposits Settled Other,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE

    33.9 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - SLUDGE ROCKS DEBRIE

  • General Observation - MAG COAT 90% START

    74.9 ft. - General Observation - MAG COAT 90% START

  • General Observation - TILES APPEAR 100% IN PLACE UNDER MAG COAT

    249.4 ft. - General Observation - TILES APPEAR 100% IN PLACE UNDER MAG COAT

Observations (16)

DistanceCodeObservation
2DAGS
33.9DSZSLUDGE ROCKS DEBRIE
347.1MGOMH CONN 3:00 ACTIVE
347.1MGOTILES100% IN PLACE UNDER MAG & GREASE COAT
2MGOTILES 100% IN PLACE START
0MWL
0AMH3:55AM
347.7AMH4:35AM
0MGOMH CONN 6:00 ACTIVE
159.8DSZDEBRIE ROCKS
25.3MGOMAG COAT 70% START
249.4MGOTILES APPEAR 100% IN PLACE UNDER MAG COAT
347.1MGOMAG COAT 90% FINISH
0MWM
347.1DAGS
74.9MGOMAG COAT 90% START

Properties (4)

custom_field_three
TILES 100% UNDER MAG & GREASE COAT
custom_field_two
3
customer
LACSD
datetime
2018-07-18T03:16:41-07:00