C 0338_C 0337_7132018_020033.mp4
2 ft. - General Observation - MAG COAT 90% START 9:00 TO 3:00
2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE
8 ft. - Surface Aggregate Projecting, from 10 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
10 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AG
69.6 ft. - General Observation - MAG COAT 100%
93.9 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
130 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
162.7 ft. - Surface Aggregate Projecting, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
202.6 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
209.4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT
334.8 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
342.7 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish - ROCKS
347.7 ft. - Surface Aggregate Visible, from 12 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG
402.9 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
512.2 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
519.6 ft. - Surface Aggregate Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG
539.7 ft. - Deposits Settled Other, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
599.6 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
620.8 ft. - General Observation - MAG COAT 100% START
680.5 ft. - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - ROCKS
| Distance | Code | Observation |
|---|---|---|
| 347.7 | SAV | SEVERE AGG |
| 620.8 | MGO | MAG COAT 100% START |
| 10 | SAV | SEVERE AG |
| 693.8 | DSZ | ROCKS |
| 406.7 | DSZ | ROCKS |
| 0 | MWM | — |
| 209.4 | SAV | SEVERE AGG UNDER MAG COAT |
| 592.2 | DSZ | ROCKS |
| 69.6 | MGO | MAG COAT 100% |
| 701.5 | MGO | MAG COAT 100% FINISH |
| 504.7 | DSZ | ROCK |
| 93.9 | SAV | SEVERE AGG |
| 130 | SAV | SEVERE AGG |
| 701.5 | SSS | BLISTERING PEELING CONCRETE |
| 701.5 | SAV | SEVERE AGG UNDER MAG COAT |
| 701.8 | MSA | CABLE PROBLEMS WILL COMPLETE REVERSE INSPECTION |
| 162.7 | SAP | SEVERE AGG |
| 342.7 | DSZ | ROCKS |
| 539.7 | DSZ | ROCKS |
| 0 | MWL | — |
| 334.8 | DSZ | ROCKS |
| 2 | MGO | MAG COAT 90% START 9:00 TO 3:00 |
| 2 | SSS | BLISTERING PEELING CONCRETE |
| 8 | SAP | SEVERE AGG |
| 512.2 | DSZ | ROCKS |
| 613.5 | DSZ | ROCKS |
| 188.1 | MGO | MAG COAT 98% START |
| 0 | AMH | 2:05AM |
| 519.6 | SAV | SEVERE AGG |
| 402.9 | DSZ | ROCKS |
| 680.5 | DSZ | ROCKS |
| 519.6 | DSZ | ROCKS |
| 202.6 | SAV | SEVERE AGG |
| 599.6 | DSZ | ROCKS |