18 0885A_18 0885_03072018_164545.mp4
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
3 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
3 ft. - Deposits Attached Other, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start - MAGNEZIUM H.O COATING FLAKING
13.1 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
13.1 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
79.7 ft. - Alignment Right, 25 %, Start
126.8 ft. - Alignment Left, 15 %, Start
| Distance | Code | Observation |
|---|---|---|
| 13.1 | SRC | — |
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 3 | DAGS | — |
| 172.9 | DAGS | — |
| 172.9 | SRC | — |
| 172.9 | LL | — |
| 111 | LR | — |
| 0 | AMH | 18 0885A |
| 3 | SRV | — |
| 126.8 | LL | — |
| 172.9 | SAP | — |
| 0 | MWM | — |
| 176.2 | AMH | 18 0885 |
| 3 | SAV | — |
| 3 | DAZ | MAGNEZIUM H.O COATING FLAKING |
| 12.5 | SAV | — |
| 12.6 | SRV | — |
| 0 | MWL | — |
| 172.9 | DAZ | — |
| 13.1 | SAP | — |
| 79.7 | LR | — |