Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 22, 2018, 07:34 AM
  • B 0402_B 0401 _22062018_004936.mp4

Date
06/22/2018
W/O
712460
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00091
PipeID
P08914
Time
12:34 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5702
Sewer Name
B JOINT OUTFALL B - UNIT 5A
City
ARCADIA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
07
Purpose
Routine Assessment
Project
WO_712460_TV15047_JUL2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
B 0402
Downstream MH
B 0401
Dir. of Survey
Downstream
Length Surveyed
299 ft.
Total Length
299 ft.
Structural Index
3
Structural Quick
3K2J
Structural Rating
291
O&M Index
4
O&M Quick
4200
O&M Rating
8
Overall Index
3
Overall Quick
Overall Rating
299
Pipe schematic from manhole B 0402 to B 0401
MH: B 0402MH: B 0401downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - B 04022.8 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start12.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start103.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"143.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"150 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"207 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"278 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"278 ft. RBL - Roots Ball Lateral, at 02 o'clock, 75 %287.3 ft. RBL - Roots Ball Lateral, at 10 o'clock, 75 %287.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"299 ft. AMH - Downstream Manhole, Survey Ends - B 0401299 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.8 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    12.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
299AMHB 0401
299SAV
0MGOCONNECTION AT MH 3 O'CLOCK
103.2TFC
278TF
0MWL
0MWM
287.3RBL
150TF
12.1SSS
143.9TFC
287.3TF
2.8SAV
0MGOCONNECTION AT MH 9 O'CLOCK
207TF
149.7TF
0AMHB 0402
299SSS
278RBL

Properties (4)

additional_info
SC359660
custom_field_two
3
customer
LACSD
datetime
2018-06-22T00:34:00-07:00