- Date
- 06/27/2018
- W/O
- 712108
- Weather
- Dry
- Operator/Surveyor
- J. BUENROSTRO
- Sewer ID
- Z00230
- PipeID
- P03993
- Time
- 12:57 AM
- Certificate
- U-715-07000770
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K5203
- Sewer Name
- 02 ARIZONA AVENUE TRUNK, SECTION 1
- City
- EAST LOS ANGELES
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 12
- Purpose
- Routine Assessment
- Project
- WO_712108_TV02004_JUL2018
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 15 in.
- Width
- 15 in.
- Upstream MH
- 02 1561
- Downstream MH
- 02 1560
- Dir. of Survey
- Downstream
- Length Surveyed
- 321 ft.
- Total Length
- 321 ft.
- Structural Index
- 3
- Structural Quick
- 3221
- Structural Rating
- 8
- O&M Index
- 3
- O&M Quick
- 4121
- O&M Rating
- 6
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 14
Pipe schematic from manhole 02 1561 to 02 1560 Observation photos (4)

2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

2.4 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

177.5 ft. - Fracture Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES