Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 27, 2018, 07:57 AM
  • 02 1561_02 1560_27062018_011746.mp4

Date
06/27/2018
W/O
712108
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00230
PipeID
P03993
Time
12:57 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5203
Sewer Name
02 ARIZONA AVENUE TRUNK, SECTION 1
City
EAST LOS ANGELES
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
WO_712108_TV02004_JUL2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1561
Downstream MH
02 1560
Dir. of Survey
Downstream
Length Surveyed
321 ft.
Total Length
321 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 02 1561 to 02 1560
MH: 02 1561MH: 02 1560downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 15610 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWL - Water Level, 20 %of cross sectional area2.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2.4 ft. CS - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start57.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"58.7 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"99.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"140 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"145.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"177.5 ft. FS - Fracture Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES178.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"220.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"222.6 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"266 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"271.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"311.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"318.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish321 ft. AMH - Downstream Manhole, Survey Ends - 02 1560

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

    2.4 ft. - Crack Spiral, from 02 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES

    177.5 ft. - Fracture Spiral, from 06 to 09 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
220.6TFC
222.6TB
177.5FS
6CM
318.3CM
318.3DAGS
58.7TB
99.2TF
178.7TF
57.9TFC
0MWM
145.4TB
321AMH02 1560
271.2TF
2.4DAGS
140TFC
311.7TF
0AMH02 1561
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
266TF
2.4CS
0MWL

Properties (4)

additional_info
SC359528
custom_field_two
3
customer
LACSD
datetime
2018-06-27T00:57:39-07:00