Wastewater/Activity/PacpInspection/1.0Jun 12, 2018, 09:30 AM
  • 15 0660_B 0621 _12062018_025202.mp4

Date
06/12/2018
W/O
707118
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00602
PipeID
P12552
Time
2:30 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5191
Sewer Name
15 EL MONTE AVENUE TRUNK
City
TEMPLE CITY
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
11
Purpose
Routine Assessment
Project
WO_707118_TV15005_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
15 0660
Downstream MH
B 0621
Dir. of Survey
Downstream
Length Surveyed
414 ft.
Total Length
414 ft.
Structural Index
3
Structural Quick
3221
Structural Rating
8
O&M Index
3
O&M Quick
4131
O&M Rating
9
Overall Index
3
Overall Quick
Overall Rating
17
Pipe schematic from manhole 15 0660 to B 0621
MH: 15 0660MH: B 0621downstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 15 06600 ft. MWM - Water Mark, 50 %of cross sectional area3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start3.1 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start6.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start60 ft. DSC - Deposits Settled Compacted, 20 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES95.3 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"95.3 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start95.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish104.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"148.4 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: NO, 6"218.1 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6"280.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"413.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish413.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish413.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish414 ft. AMH - Downstream Manhole, Survey Ends - B 0621

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    3.1 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    95.3 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
3DAGS
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
413.9DAGS
280.7TF
0MWL
0AMH15 0660
95.3TF
413.9SAP
95.3SAP
0MWM
413.9SSS
60DSC
104.3TFC
414AMHB 0621
6.6SSS
3.1SAV
218.1TB
95.3SAV
148.4TB

Properties (4)

additional_info
SC359514
custom_field_two
2
customer
LACSD
datetime
2018-06-12T02:30:59-07:00