15 0665_15 0664 _11062018_235437.mp4
2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start
2.4 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
37.9 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES
43.4 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start
153.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start
267.7 ft. - Repair Other, within 8 inches of joint: YES - LINK PIPE SLEEVE
| Distance | Code | Observation |
|---|---|---|
| 149.5 | TB | — |
| 115.5 | TFC | — |
| 267.7 | RPZ | LINK PIPE SLEEVE |
| 37.9 | SSS | — |
| 70.1 | TF | — |
| 2.1 | DAGS | — |
| 267.2 | SSS | — |
| 33.6 | TFC | — |
| 9.3 | TF | — |
| 0 | AMH | 15 0665 |
| 43.4 | SSS | — |
| 0 | MWL | — |
| 153.8 | SAV | — |
| 267.2 | SAP | — |
| 267.2 | DAGS | — |
| 267.2 | MSA | CANNOT PASS LINK |
| 155.1 | TF | — |
| 188.3 | TFC | — |
| 2.4 | SAV | — |
| 0 | MWM | — |
| 236.3 | TFC | — |
| 153.8 | SAP | — |