Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2018, 08:21 AM
  • 14 0382_14 0381A _07062018_012958.mp4

Date
06/07/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18462
Time
1:21 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5721
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0382
Downstream MH
14 0381A
Dir. of Survey
Downstream
Length Surveyed
202.9 ft.
Total Length
202.9 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
200
O&M Index
2
O&M Quick
412G
O&M Rating
84
Overall Index
2
Overall Quick
Overall Rating
284
Pipe schematic from manhole 14 0382 to 14 0381A
MH: 14 0382MH: 14 0381Adownstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 03820 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 60 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"47.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"76 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"99.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"124.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"152.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"176.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"200.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"200.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish200.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish200.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish202.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE202.9 ft. AMH - Downstream Manhole, Survey Ends - 14 0381A202.9 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
124.6TFC
202.9MGOCOCKROACHES IN MANHOLE
202.9AMH14 0381A
99.8TFC
27.3TFC
202.9MGOACTIVE CONNECTION AT MH 9 O'CLOCK
152.1TFC
200.9DAGS
200.9SSS
200.9SAP
0AMH14 0382
2SAP
47.5TFC
176.6TFC
2DAGS
2SSS
200.5TFC
0MWL
0MWM
76TFC

Properties (4)

additional_info
SC359387
custom_field_two
2
customer
LACSD
datetime
2018-06-07T01:21:32-07:00