Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 11:30 AM
  • 14 0403_14 0402 _11062018_044842.mp4

Date
06/11/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18486
Time
4:30 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5724
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0403
Downstream MH
14 0402
Dir. of Survey
Downstream
Length Surveyed
438.2 ft.
Total Length
438.2 ft.
Structural Index
3
Structural Quick
3P2P
Structural Rating
435
O&M Index
2
O&M Quick
3D2Q
O&M Rating
248
Overall Index
2
Overall Quick
Overall Rating
683
Pipe schematic from manhole 14 0403 to 14 0402
MH: 14 0403MH: 14 0402downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 04030 ft. MWL - Water Level, 10 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start4.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start31.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"57 ft. TBI - Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: NO, 6", 1"59.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"84.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"108.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"128.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"157.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"181.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"206.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"231.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"255.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"283.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"308.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"319.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS332.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"357 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"409.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"438.2 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK438.2 ft. MGO - General Observation - COCKROACHES IN MANHOLE438.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish438.2 ft. AMH - Downstream Manhole, Survey Ends - 14 0402438.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish438.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish438.2 ft. DSZ - Deposits Settled Other, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    4.9 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: NO, 6", 1"

    57 ft. - Tap Break-In Intruding, at 09 o'clock, -, #v, within 8 inches of joint: NO, 6", 1"

  • General Observation - COCKROACHES IN MANHOLE

    438.2 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (30)

DistanceCodeObservation
2SAP
332.4TFC
438.2MGOACTIVE CONNECTION AT MH 9 O'CLOCK
438.2MGOCOCKROACHES IN MANHOLE
319.2DSZDEBRIS
57TBI
357TFC
255.2TFC
157.1TFC
84.1TFC
4.9SSS
31.2TFC
308.2TFC
438.2SAP
0MWM
181.8TFC
231.2TFC
128.8TFC
409.5TFC
2DAGS
438.2AMH14 0402
206.6TFC
0AMH14 0403
59.3TFC
438.2DAGS
0MWL
108.6TFC
438.2SSS
438.2DSZ
283.7TFC

Properties (4)

additional_info
SC359390
custom_field_two
2
customer
LACSD
datetime
2018-06-11T04:30:33-07:00