Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2018, 08:11 AM
  • 14 0388_14 0387 _06062018_012503.mp4

  • 14 0388_14 0387 _06062018_014155.mp4

Date
06/06/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18468
Time
1:11 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5720
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
14 0388
Downstream MH
14 0387
Dir. of Survey
Downstream
Length Surveyed
306.3 ft.
Total Length
306.3 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
305
O&M Index
2
O&M Quick
412K
O&M Rating
126
Overall Index
2
Overall Quick
Overall Rating
431
Pipe schematic from manhole 14 0388 to 14 0387
MH: 14 0388MH: 14 0387downstream0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 14 03882 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start27.2 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"55.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"75.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"103.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"123.9 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"148.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"176.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"196.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"232.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"257.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"274.7 ft. MGO - General Observation - UNMAPPED MH.304.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish304.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish304.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish306.3 ft. AMH - Downstream Manhole, Survey Ends - 14 0387306.3 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
306.3AMH14 0387
2SSS
2SAP
27.2TFA
55.2TFC
2DAGS
304.9SAP
0MWL
196.8TFC
0MWM
0AMH14 0388
304.9DAGS
75.8TF
103.6TFC
123.9TFA
306.3MGOCAPPED CONNECTION AT MH 9 O'CLOCK
304.9SSS
232.9TFC
257.5TFC
176.6TFC
274.7MGOUNMAPPED MH.
148.3TFC

Properties (4)

additional_info
SC359386
custom_field_two
2
customer
LACSD
datetime
2018-06-06T01:11:17-07:00