Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 11, 2018, 10:26 AM
  • 14 0398_14 0397 _11062018_033234.mp4

Date
06/11/2018
W/O
707005
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00581
PipeID
P18480
Time
3:26 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5724
Sewer Name
14 TRUNK "E"
City
LANCASTER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 14
Page No.
17
Purpose
Routine Assessment
Project
WO_707005_TV14025_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
14 0398
Downstream MH
14 0397
Dir. of Survey
Downstream
Length Surveyed
63.1 ft.
Total Length
63.1 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
60
O&M Index
2
O&M Quick
412A
O&M Rating
28
Overall Index
2
Overall Quick
Overall Rating
88
Pipe schematic from manhole 14 0398 to 14 0397
MH: 14 0398MH: 14 0397downstream0 ft. AMH - Upstream Manhole, Survey Begins - 14 03980 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start5.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"29.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"61 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish61 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish61 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish63.1 ft. AMH - Downstream Manhole, Survey Ends - 14 0397, RUN LIST STATES MH AT 30'.

Observation photos (4)

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Downstream Manhole, Survey Ends - 14 0397, RUN LIST STATES MH AT 30'.

    63.1 ft. - Downstream Manhole, Survey Ends - 14 0397, RUN LIST STATES MH AT 30'.

Observations (13)

DistanceCodeObservation
2SAP
5.2TFC
63.1AMH14 0397, RUN LIST STATES MH AT 30'.
0AMH14 0398
0MWM
2SSS
0MWL
61SAP
2DAGS
61DAGS
0MGOACTIVE CONNECTION AT MH 3 O'CLOCK
61SSS
29.5TFC

Properties (4)

additional_info
SC359390
custom_field_two
2
customer
LACSD
datetime
2018-06-11T03:26:57-07:00