18 0020A_18 0020 _08062018_032713.mp4
3 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
131.1 ft. - Surface Spalling, from 02 to 04 o'clock, within 8 inches of joint: NO, Start
190.9 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES
196.8 ft. - Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES
215.5 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
| Distance | Code | Observation |
|---|---|---|
| 36.9 | TFC | — |
| 0 | MWL | — |
| 260 | SAV | — |
| 131.1 | SSS | — |
| 262.1 | MGO | SERVICE CONNECTION AT 3 O' CLOCK AT MH |
| 110.4 | TF | — |
| 3 | SAV | — |
| 0 | AMH | 18 0020 |
| 159.1 | TF | — |
| 215.5 | FM | — |
| 238.3 | TFC | — |
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 208.1 | TF | — |
| 250.8 | TFC | — |
| 3.9 | MGO | MAGNEZIUM H.O COATING start , FLAKING |
| 0 | MWM | — |
| 58 | TF | — |
| 103.9 | TFC | — |
| 260 | DAGS | — |
| 260.3 | MGO | MAGNEZIUM H.O COATING finish |
| 196.8 | CM | — |
| 190.9 | CL | — |
| 3 | DAGS | — |
| 262.1 | AMH | 18 0020A |
| 190.2 | SSS | — |