F 0187_F 0186_7112018_033755.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
2 ft. - General Observation - MAG COAT 98% START 8:00 TO 4:00
100.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE UNDER MAG COAT
131.4 ft. - Surface Spalling, from 02 to 03 o'clock, within 8 inches of joint: NO - SWOLLEN BLISTERING CONCRETE
177.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERIN PEELING CONCRETE
183.8 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 07 to 08 o'clock, , within 8 inches of joint: YES
199.1 ft. - General Observation - MAG COAT 100%
372.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLIISTERING PEELING CONCRETE
392.9 ft. - General Observation - MAG COAT 100%
419 ft. - Surface Spalling, from 09 to 11 o'clock, within 8 inches of joint: NO - PEELING CONCRETE
434.7 ft. - Surface Aggregate Visible, from 09 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 199.1 | MGO | MAG COAT 100% |
| 372.6 | SSS | BLIISTERING PEELING CONCRETE |
| 0 | MWM | — |
| 419 | SSS | PEELING CONCRETE |
| 70.1 | DSZ | ROCKS |
| 177.6 | SSS | BLISTERIN PEELING CONCRETE |
| 449.8 | AMH | 4:40AM |
| 449.4 | SSS | BLISTERING PEELING CONCRETE |
| 100.8 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | AMH | 3:55AM |
| 449.4 | MGO | MAG COAT 98% |
| 434.7 | SAV | SEVERE AGG |
| 178.6 | DAGS | — |
| 23.1 | DSZ | ROCK |
| 392.9 | MGO | MAG COAT 100% |
| 12.4 | DSZ | ROCKS |
| 131.4 | SSS | SWOLLEN BLISTERING CONCRETE |
| 178.6 | TFC | Capped |
| 0 | MWL | — |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 2 | MGO | MAG COAT 98% START 8:00 TO 4:00 |
| 178.6 | TF | Open |
| 183.8 | DAGS | — |