Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2018, 04:59 AM
  • 18 0042_18 0041 _05062018_221311.mp4

Date
06/05/2018
W/O
707282
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00689
PipeID
P13857
Time
9:59 PM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5638
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_707282_TV18176_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0042
Downstream MH
18 0041
Dir. of Survey
Downstream
Length Surveyed
253.8 ft.
Total Length
253.8 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
6
Pipe schematic from manhole 18 0042 to 18 0041
MH: 18 0042MH: 18 0041downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 00420 ft. MWM - Water Mark, 30 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start14.4 ft. MGO - General Observation - MAGNESIUM COATING START55.9 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"105 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"112.6 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES114.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"169.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 4"175.1 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: YES, 4"223.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"227 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"252.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish252.3 ft. MGO - General Observation - MAGNESIUM COATING END253.8 ft. AMH - Downstream Manhole, Survey Ends - 18 0041

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

  • Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

    112.6 ft. - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
0MWL
2.1SAP
175.1TFC
0AMH18 0042
252.3SAP
169.5TFC
227TFC
114.2TFC
223.8TFC
252.3MGOMAGNESIUM COATING END
0MWM
105TFC
253.8AMH18 0041
14.4MGOMAGNESIUM COATING START
55.9TFC
112.6FL

Properties (4)

additional_info
SC359193
custom_field_two
2
customer
LACSD
datetime
2018-06-05T21:59:54-07:00