Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 6, 2018, 07:08 AM
  • 18 0038_18 0037 _06062018_003013.mp4

Date
06/06/2018
W/O
707282
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00689
PipeID
P13853
Time
12:08 AM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5638
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_707282_TV18176_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0037
Downstream MH
18 0038
Dir. of Survey
Upstream
Length Surveyed
308.3 ft.
Total Length
308.3 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
3
Pipe schematic from manhole 18 0037 to 18 0038
MH: 18 0037MH: 18 0038upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 00380 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK0.4 ft. MGO - General Observation - MAGNESIUM COATING END0.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Finish57.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"107.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"113.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"174.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"180.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"244.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"250.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"298.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"305.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"306.2 ft. MGO - General Observation - MAGNESIUM COATING START306.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start308.3 ft. AMH - Downstream Manhole, Survey Begins - 18 0037308.3 ft. MWM - Water Mark, 25 %of cross sectional area308.3 ft. MWL - Water Level, 25 %of cross sectional area

Observation photos (1)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO, Start

Observations (18)

DistanceCodeObservation
0AMH18 0037
201.1TFC
250.5TFC
307.9MGOMAGNESIUM COATING END
3.2TFC
0MWM
308.3AMH18 0038
2.1MGOMAGNESIUM COATING START
127.9TF
308.3MGOCONNECTION AT MH 3 OCLOCK
195.1TFC
133.8TFC
58TFC
0MWL
10.2TF
2.1SAP
64.2TF
307.9SAP

Properties (4)

additional_info
SC359193
custom_field_two
2
customer
LACSD
datetime
2018-06-06T00:08:56-07:00