Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 1, 2018, 08:12 AM
  • 18 0059_18 0058 _01062018_013151.mp4

Date
06/01/2018
W/O
707282
Weather
Dry
Operator/Surveyor
K. ADAME
Sewer ID
Z00689
PipeID
P13873
Time
1:12 AM
Certificate
U-0817-07009000
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5632
Sewer Name
18 MILLS AVENUE TRUNK
City
WHITTTIER, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
WO_707282_TV18176_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
18 0059
Downstream MH
18 0058
Dir. of Survey
Downstream
Length Surveyed
320.1 ft.
Total Length
320.1 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 18 0059 to 18 0058
MH: 18 0059MH: 18 0058downstream0 ft. AMH - Upstream Manhole, Survey Begins - 18 00590 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 OCLOCK2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start29.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"61.1 ft. MGO - General Observation - MAGNESIUM COATING START79.1 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES94.5 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES114.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"115.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES120.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"141.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"205.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"211.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"232.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"277.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"280.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"305 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"318.2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318.2 ft. MGO - General Observation - MAGNESIUM COATING END320.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0058

Observation photos (4)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

    79.1 ft. - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    94.5 ft. - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

    115.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (22)

DistanceCodeObservation
277.7TF
94.5FL
141.5TF
115.7FM
320.1AMH18 0058
61.1MGOMAGNESIUM COATING START
29.2TF
0AMH18 0059
120.4TF
205.2TF
0MWM
0MWL
318.2SAV
280.6TF
0MGOCONNECTION AT MH 3 OCLOCK
305TF
211.4TF
2.1SAV
79.1FC
232.5TF
318.2MGOMAGNESIUM COATING END
114.2TF

Properties (4)

additional_info
SC359187
custom_field_two
3
customer
LACSD
datetime
2018-06-01T01:12:43-07:00