Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2018, 10:53 AM
  • 05 1466_05 1465 _14062018_040842.mp4

Date
06/14/2018
W/O
707009
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00438
PipeID
P06688
Time
3:53 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5730
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_707009_TV05300_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1466
Downstream MH
05 1465
Dir. of Survey
Downstream
Length Surveyed
322.3 ft.
Total Length
322.3 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
2
O&M Quick
2L00
O&M Rating
128
Overall Index
2
Overall Quick
Overall Rating
448
Pipe schematic from manhole 05 1466 to 05 1465
MH: 05 1466MH: 05 1465downstream0 ft. AMH - Upstream Manhole, Survey Begins - 05 14660 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0.1 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start22.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"61.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"122.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"162 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"171 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"222 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"273.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"321.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish321.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish321.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish322.3 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 AND 8 O'CLOCK322.3 ft. AMH - Downstream Manhole, Survey Ends - 05 1465322.3 ft. MGO - General Observation - COCKROACHES IN MANHOLE322.3 ft. MGO - General Observation - CAPPED CONNECTION AT MH 9 O'CLOCK

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
222TFC
321.2DAGS
0AMH05 1466
61.1TFC
322.3MGOACTIVE CONNECTION AT MH 3 AND 8 O'CLOCK
0MGOCOCKROACHES IN MANHOLE
162TFC
122.2TFC
2SSS
2SAP
0.1MGOACTIVE CONNECTION AT MH 3 O'CLOCK
2DAGS
273.4TFC
321.2SSS
22.3TFC
322.3AMH05 1465
322.3MGOCOCKROACHES IN MANHOLE
0MWM
171TFC
321.2SAP
322.3MGOCAPPED CONNECTION AT MH 9 O'CLOCK
0MWL

Properties (4)

additional_info
SC359396
custom_field_two
2
customer
LACSD
datetime
2018-06-14T03:53:42-07:00