Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 14, 2018, 08:16 AM
  • 05 1469A_05 1469 _14062018_012537.mp4

Date
06/14/2018
W/O
707009
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00438
PipeID
P06692
Time
1:16 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5730
Sewer Name
05 EL NIDO TRUNK
City
TORRANCE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
23
Purpose
Routine Assessment
Project
WO_707009_TV05300_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1469A
Downstream MH
05 1469
Dir. of Survey
Downstream
Length Surveyed
147.2 ft.
Total Length
147.2 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
145
O&M Index
2
O&M Quick
2E00
O&M Rating
58
Overall Index
2
Overall Quick
Overall Rating
203
Pipe schematic from manhole 05 1469A to 05 1469
MH: 05 1469AMH: 05 1469downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 05 1469A2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start65.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"117.4 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: NO, 4"144.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish144.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish144.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish147.2 ft. MGO - General Observation - CAPPED CONNECTION AT MH 3 O'CLOCK147.2 ft. AMH - Downstream Manhole, Survey Ends - 05 1469

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (14)

DistanceCodeObservation
2SSS
0MWM
0MGOACTIVE CONNECTION AT MH 9 O'CLOCK
117.4TFA
144.7SAP
144.7SSS
147.2MGOCAPPED CONNECTION AT MH 3 O'CLOCK
2SAP
65.4TFC
147.2AMH05 1469
144.7DAGS
0MWL
2DAGS
0AMH05 1469A

Properties (4)

additional_info
SC359396
custom_field_two
2
customer
LACSD
datetime
2018-06-14T01:16:58-07:00