02 0942_02 0941 _05062018_025407.mp4
2 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
41.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING
255.4 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO, Start
344.9 ft. - Deposits Settled Compacted, 20 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
379.1 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO
| Distance | Code | Observation |
|---|---|---|
| 394.4 | DAGS | — |
| 394.4 | SSS | — |
| 2 | SRI | — |
| 0 | MGO | SERVICE CONNECTION AT 9 O'CLOCK AT MH |
| 396.1 | AMH | 02 0942 |
| 379.1 | CL | — |
| 276.3 | CL | — |
| 2 | DAGS | — |
| 41.7 | SSS | MAG COATING |
| 389.9 | DSC | — |
| 0 | AMH | 02 0941 |
| 394.4 | SRI | — |
| 344.9 | DSC | — |
| 0.1 | MWM | — |
| 0 | MWL | — |
| 255.4 | CL | — |