Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 13, 2018, 07:14 AM
  • 08 0213_08 0212A _13062018_003248.mp4

Date
06/13/2018
W/O
706728
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00005
PipeID
P21320
Time
12:14 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5728
Sewer Name
08 EAST ROAD TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Routine Assessment
Project
WO_706728_TV08013_JUN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
08 0213
Downstream MH
08 0212A
Dir. of Survey
Downstream
Length Surveyed
244.5 ft.
Total Length
244.5 ft.
Structural Index
3
Structural Quick
3D21
Structural Rating
71
O&M Index
2
O&M Quick
4131
O&M Rating
105
Overall Index
2
Overall Quick
Overall Rating
176
Pipe schematic from manhole 08 0213 to 08 0212A
MH: 08 0213MH: 08 0212Adownstream0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 02130 ft. MWM - Water Mark, 50 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start33.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"58.8 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES112.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"114.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES130.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start187.2 ft. RML - Roots Medium Lateral, from 09 to 03 o'clock, 40 %, within 8 inches of joint: YES187.2 ft. TFD - Tap Factory Made Defective, at 12 o'clock, -, within 8 inches of joint: NO, 4"242.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish242.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish244.5 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 3 O'CLOCK244.5 ft. AMH - Downstream Manhole, Survey Ends - 08 0212A

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    58.8 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    114.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    130.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Roots Medium Lateral, from 09 to 03 o'clock, 40 %, within 8 inches of joint: YES

    187.2 ft. - Roots Medium Lateral, from 09 to 03 o'clock, 40 %, within 8 inches of joint: YES

Observations (15)

DistanceCodeObservation
33.1TFC
244.5MGOACTIVE CONNECTION AT MH 3 O'CLOCK
0MWL
242.6CM
112.5TFC
130.4CM
187.2RML
242.6DAGS
244.5AMH08 0212A
187.2TFD
114.4CM
0AMH08 0213
58.8CL
0MWM
2DAGS

Properties (4)

additional_info
SC359394
custom_field_two
3
customer
LACSD
datetime
2018-06-13T00:14:42-07:00