Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2018, 08:24 AM
  • 02 0012_02 0011_05062018_014652.mp4

Date
06/05/2018
W/O
706730
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00234
PipeID
P03038
Time
1:24 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5185
Sewer Name
02 ARTESIA EXTENSION TRUNK
City
BELLFLOWER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
38
Purpose
Routine Assessment
Project
WO_706730_TV02341_JUN2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
02 0011
Downstream MH
02 0012
Dir. of Survey
Upstream
Length Surveyed
391.4 ft.
Total Length
391.4 ft.
Structural Index
3
Structural Quick
4132
Structural Rating
18
O&M Index
2
O&M Quick
4131
O&M Rating
17
Overall Index
3
Overall Quick
Overall Rating
35
Pipe schematic from manhole 02 0011 to 02 0012
MH: 02 0011MH: 02 0012upstream0 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH0 ft. AMH - Upstream Manhole, Survey Ends - 02 00121.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Finish1.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish1.3 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish36.2 ft. CS - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start48.5 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO49.2 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"88.2 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO89.1 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"168.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start195.1 ft. FS - Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES, Finish210.1 ft. FS - Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES, Start211.2 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: NO, 6"248 ft. TBC - Tap Break-In Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"253.5 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish263 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start263 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish337.8 ft. TBI - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 6", 1"367.2 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"368 ft. DAGS - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO375 ft. FM - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES387.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start388.5 ft. FS - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start391.4 ft. MWM - Water Mark, 50 %of cross sectional area391.4 ft. MWL - Water Level, 30 %of cross sectional area391.4 ft. AMH - Downstream Manhole, Survey Begins - 02 0011

Observation photos (11)

  • Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    2.9 ft. - Fracture Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    4.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    16.4 ft. - Fracture Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: NO

    23.4 ft. - Deposits Attached Grease, 20 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: NO

  • Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 6", 1"

    53.6 ft. - Tap Break-In Intruding, at 12 o'clock, -, -, within 8 inches of joint: YES, 6", 1"

  • Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    128.4 ft. - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES, Start

    181.3 ft. - Fracture Spiral, from 12 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock,  , within 8 inches of joint: YES, Start

    223.3 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO

    303.2 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO

    342.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO

  • Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

    355.2 ft. - Crack Spiral, from 10 to 02 o'clock, within 8 inches of joint: YES, Start

Observations (28)

DistanceCodeObservation
137.9CS
390.1DAE
23.4DAGS
303.2CL
196.3FS
143.4TBC
355.2CS
390.1DAGS
24.2TBA
0MWM
16.4FM
4.2DAGS
180.2TB
181.3FS
0MWL
223.3DAE
391.4MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
128.4CS
390.1CS
302.3TB
391.4MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
53.6TBI
0AMH02 0011
342.2TBC
2.9FS
342.9CL
391.4AMH02 0012
128.4FS

Properties (4)

additional_info
SC359507
custom_field_two
2
customer
LACSD
datetime
2018-06-05T01:24:22-07:00