- Date
- 06/05/2018
- W/O
- 706730
- Weather
- Dry
- Operator/Surveyor
- J, BUENROSTRO
- Sewer ID
- Z00234
- PipeID
- P03039
- Time
- 1:47 AM
- Certificate
- U-715-07000770
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- K5185
- Sewer Name
- 02 ARTESIA EXTENSION TRUNK
- City
- BELLFLOWER
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 02
- Page No.
- 38
- Purpose
- Routine Assessment
- Project
- WO_706730_TV02341_JUN2018
- Sewer Type
- Gravity
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 21 in.
- Width
- 21 in.
- Upstream MH
- 02 0012
- Downstream MH
- 02 0012A
- Dir. of Survey
- Upstream
- Length Surveyed
- 23.6 ft.
- Total Length
- 23.6 ft.
- Structural Index
- 2
- Structural Quick
- 2100
- Structural Rating
- 2
- O&M Index
- 3
- O&M Quick
- 4131
- O&M Rating
- 11
- Overall Index
- 3
- Overall Quick
- —
- Overall Rating
- 13
Pipe schematic from manhole 02 0012 to 02 0012A Observation photos (4)

3.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

3.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 03 o'clock, , within 8 inches of joint: YES, Start

5.1 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: NO

19.8 ft. - Deposits Attached Grease, 20 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: YES