Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2018, 09:21 AM
  • H 0555_H 0554A _04062018_022825.mp4

Date
06/04/2018
W/O
701217
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00186
PipeID
P25681
Time
2:21 AM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5684
Sewer Name
H JOINT OUTFALL H - UNIT 8C
City
BALDWIN PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
24
Purpose
Routine Assessment
Project
WO_701217_TV15170_MAY2018
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Width
30 in.
Upstream MH
H 0555
Downstream MH
H 0554A
Dir. of Survey
Downstream
Length Surveyed
153.1 ft.
Total Length
153.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
0
Overall Quick
Overall Rating
0
Pipe schematic from manhole H 0555 to H 0554A
MH: H 0555MH: H 0554Adownstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - H 05552.6 ft. MGO - General Observation - MAG COAT43.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"85.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"98.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"106.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"153.1 ft. AMH - Downstream Manhole, Survey Ends - H 0554A153.1 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observations (10)

DistanceCodeObservation
153.1AMHH 0554A
0MWM
85.9TF
106.8TFC
0MWL
153.1MGOCONNECTION AT MH 9 O'CLOCK
98.9TFC
2.6MGOMAG COAT
0AMHH 0555
43.6TF

Properties (4)

additional_info
SC359342
custom_field_two
4
customer
LACSD
datetime
2018-06-04T02:21:40-07:00