Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 4, 2018, 07:50 AM
  • 02 1033_02 1032_04062018_013136.mp4

Date
06/04/2018
W/O
706765
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00280
PipeID
P03607
Time
12:50 AM
Certificate
U-715-07000770
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K5182
Sewer Name
02 MONTEBELLO CITY TRUNK
City
MONTEBELLO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
14
Purpose
Routine Assessment
Project
WO_706765_TV02295_JUN2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
02 1033
Downstream MH
02 1032
Dir. of Survey
Downstream
Length Surveyed
328.1 ft.
Total Length
328.1 ft.
Structural Index
3
Structural Quick
5131
Structural Rating
13
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
15
Pipe schematic from manhole 02 1033 to 02 1032
MH: 02 1033MH: 02 1032downstream0 ft. AMH - Upstream Manhole, Survey Begins - 02 10330 ft. MGO - General Observation - SERVICE CONNECTION AT 3 O' CLOCK AT MH0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAGNEZIUM H.O COATING start19.4 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES24.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING49.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"75.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"78.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"98.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"116.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"119.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"176.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"179.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"213.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"216.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"247.4 ft. HSV - Hole Soil Visible, from 10 to 03 o'clock, within 8 inches of joint: YES - UNKNOW OBJECT INTRUDING262.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"265.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"290.7 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start290.7 ft. SRI - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: NO, 6"322.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: NO, 6"326.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish326.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.2 ft. SAV - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish328.1 ft. AMH - Downstream Manhole, Survey Ends - 02 1032328.1 ft. MGO - General Observation - SERVICE CONNECTION AT 9 O'CLOCK AT MH

Observation photos (6)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Roughness Increased, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    19.4 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

    24.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MAG COATING

  • Hole Soil Visible, from 10 to 03 o'clock, within 8 inches of joint: YES - UNKNOW OBJECT INTRUDING

    247.4 ft. - Hole Soil Visible, from 10 to 03 o'clock, within 8 inches of joint: YES - UNKNOW OBJECT INTRUDING

  • Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    290.7 ft. - Surface Aggregate Visible, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (32)

DistanceCodeObservation
290.7SAV
262.5TFC
78.1TFC
119.2TFC
326.2DAGS
0AMH02 1033
299TFC
247.4HSVUNKNOW OBJECT INTRUDING
176.7TFC
49.3TFC
19.4CL
326.2SSS
98.8TFC
24.5SSSMAG COATING
0MGOSERVICE CONNECTION AT 3 O' CLOCK AT MH
2DAGS
179.5TFC
0MWM
213.3TFC
290.7SRI
265.3TFC
328.1AMH02 1032
2SRI
0MWL
216.1TFC
0MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
328.1MGOSERVICE CONNECTION AT 9 O'CLOCK AT MH
326.2SAV
2MGOMAGNEZIUM H.O COATING start
116.9TFC
75.4TFC
322.6TFC

Properties (4)

additional_info
SC359504
custom_field_two
1
customer
LACSD
datetime
2018-06-04T00:50:08-07:00