Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 05:36 AM
  • 22 0655_22 0654 _21052018_230201.mp4

Date
05/21/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17003
Time
10:36 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0655
Downstream MH
22 0654
Dir. of Survey
Downstream
Length Surveyed
64.6 ft.
Total Length
64.6 ft.
Structural Index
3
Structural Quick
3A2A
Structural Rating
55
O&M Index
2
O&M Quick
2B00
O&M Rating
26
Overall Index
2
Overall Quick
Overall Rating
81
Pipe schematic from manhole 22 0655 to 22 0654
MH: 22 0655MH: 22 0654downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06550 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start62.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish62.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish62.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish64.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE64.6 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK64.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0654

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    0 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
64.6MGOCOCKROACHES IN MANHOLE
64.6MGOACTIVE CONNECTION AT MH 9 O'CLOCK
5.5SAP
62.6SAP
62.6SSS
0MWL
64.6AMH22 0654
62.6DAGS
0MWM
6.7SSS
0AMH22 0655
0MGOCOCKROACHES IN MANHOLE
0DAGS

Properties (4)

additional_info
SC359371
custom_field_two
3
customer
LACSD
datetime
2018-05-21T22:36:28-07:00