Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2018, 09:38 AM
  • 22 0638_22 0637 _23052018_025313.mp4

Date
05/23/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16986
Time
2:38 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5708
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0638
Downstream MH
22 0637
Dir. of Survey
Downstream
Length Surveyed
210.6 ft.
Total Length
210.6 ft.
Structural Index
3
Structural Quick
3G2G
Structural Rating
205
O&M Index
2
O&M Quick
2G00
O&M Rating
82
Overall Index
2
Overall Quick
Overall Rating
287
Pipe schematic from manhole 22 0638 to 22 0637
MH: 22 0638MH: 22 0637downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06382 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start21.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"50.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"74.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"99.5 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"119.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"148.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"173.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"197.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"208.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish208.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish208.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish210.6 ft. AMH - Downstream Manhole, Survey Ends - 22 0637210.6 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
208.7DAGS
208.7SSS
210.6AMH22 0637
197.7TFA
210.6MGOCOCKROACHES IN MANHOLE
119.6TFC
74.9TFC
0MWM
0MGOCOCKROACHES IN MANHOLE
148.6TFC
50.5TFA
0MWL
21.8TFC
99.5TFA
2SAP
2SSS
2DAGS
173.4TFC
208.7SAP
0AMH22 0638

Properties (4)

additional_info
SC359374
custom_field_two
2
customer
LACSD
datetime
2018-05-23T02:38:24-07:00