Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 07:46 AM
  • 22 0647_22 0646 _22052018_010749.mp4

Date
05/22/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16995
Time
12:46 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0647
Downstream MH
22 0646
Dir. of Survey
Downstream
Length Surveyed
329.9 ft.
Total Length
329.9 ft.
Structural Index
3
Structural Quick
3L2K
Structural Rating
319
O&M Index
2
O&M Quick
312L
O&M Rating
133
Overall Index
2
Overall Quick
Overall Rating
452
Pipe schematic from manhole 22 0647 to 22 0646
MH: 22 0647MH: 22 0646downstream0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 06470 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start16.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start69.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"91.9 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS121.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"126.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"191 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"243.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"301.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"304.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"327.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish327.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish327.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish329.9 ft. MGO - General Observation - COCKROACHES IN MANHOLE329.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0646

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    16.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  15 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES - DEBRIS

    91.9 ft. - Deposits Settled Other, 15 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - DEBRIS

Observations (20)

DistanceCodeObservation
329.9MGOCOCKROACHES IN MANHOLE
126.8TFC
0MWM
2DAGS
0AMH22 0647
0MGOCOCKROACHES IN MANHOLE
2SAP
329.9AMH22 0646
16.1SSS
121.9TFC
243.9TFC
69.1TFC
0MWL
304.6TFC
301.1TFC
327.9SAP
327.9SSS
91.9DSZDEBRIS
191TFC
327.9DAGS

Properties (4)

additional_info
SC359371
custom_field_two
2
customer
LACSD
datetime
2018-05-22T00:46:52-07:00