Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 06:27 AM
  • 22 0652_22 0651 _21052018_234105.mp4

Date
05/21/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P17000
Time
11:27 PM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0652
Downstream MH
22 0651
Dir. of Survey
Downstream
Length Surveyed
337 ft.
Total Length
337 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
331
O&M Index
2
O&M Quick
2L00
O&M Rating
134
Overall Index
2
Overall Quick
Overall Rating
465
Pipe schematic from manhole 22 0652 to 22 0651
MH: 22 0652MH: 22 0651downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06520 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start27.5 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"39.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"64.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"88.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4"137.4 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"166.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"190.1 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 4"251.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 4"256 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"335.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish335.7 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish335.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish337 ft. MGO - General Observation - ACTIVE CONNECTION AT MH 9 O'CLOCK337 ft. AMH - Downstream Manhole, Survey Ends - 22 0651

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    10.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (21)

DistanceCodeObservation
335.7DAGS
0AMH22 0652
256TFC
27.5TBA
64.1TF
337MGOACTIVE CONNECTION AT MH 9 O'CLOCK
10.6SSS
39.9TF
0MGOCOCKROACHES IN MANHOLE
0MWL
88.8TF
335.7SSS
337AMH22 0651
166.5TF
137.4TFA
190.1TFA
2DAGS
335.7SAP
2SAP
0MWM
251.9TF

Properties (4)

additional_info
SC359371
custom_field_two
2
customer
LACSD
datetime
2018-05-21T23:27:11-07:00