Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 22, 2018, 07:36 AM
  • 22 0648_22 0647 _22052018_004634.mp4

Date
05/22/2018
W/O
701523
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00827
PipeID
P16996
Time
12:36 AM
Certificate
U-111-11880
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5605
Sewer Name
22 SUNFLOWER TRUNK
City
GLENDORA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
22
Purpose
Routine Assessment
Project
WO_701523_TV22166_MAY2018
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0648
Downstream MH
22 0647
Dir. of Survey
Downstream
Length Surveyed
119.4 ft.
Total Length
119.4 ft.
Structural Index
3
Structural Quick
3D2C
Structural Rating
109
O&M Index
2
O&M Quick
2D00
O&M Rating
46
Overall Index
2
Overall Quick
Overall Rating
155
Pipe schematic from manhole 22 0648 to 22 0647
MH: 22 0648MH: 22 0647downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 06480 ft. MGO - General Observation - COCKROACHES IN MANHOLE0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start19.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start41.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"45.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"90.1 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"94.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"118.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish118.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish118.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish119.4 ft. MGO - General Observation - COCKROACHES IN MANHOLE119.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0647

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    19.5 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
94.3TFC
118.1DAGS
90.1TFC
41.2TFC
45.1TFC
118.1SSS
119.4MGOCOCKROACHES IN MANHOLE
2SAP
118.1SAP
0AMH22 0648
19.5SSS
2DAGS
119.4AMH22 0647
0MGOCOCKROACHES IN MANHOLE
0MWL
0MWM

Properties (4)

additional_info
SC359371
custom_field_two
2
customer
LACSD
datetime
2018-05-22T00:36:12-07:00