Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 5, 2018, 06:15 AM
  • 05 1006_05 1005 _04062018_232933.mp4

Date
06/04/2018
W/O
701088
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00421
PipeID
P06238
Time
11:15 PM
Certificate
U-508-7069
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K5687
Sewer Name
05 AVIATION BOULEVARD TRUNK
City
EL SEGUNDO
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
16
Purpose
Routine Assessment
Project
WO_701088_TV05252_MAY2018
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
05 1006
Downstream MH
05 1005
Dir. of Survey
Downstream
Length Surveyed
334.6 ft.
Total Length
334.6 ft.
Structural Index
3
Structural Quick
413L
Structural Rating
201
O&M Index
2
O&M Quick
2K00
O&M Rating
122
Overall Index
3
Overall Quick
Overall Rating
323
Pipe schematic from manhole 05 1006 to 05 1005
MH: 05 1006MH: 05 1005downstream0 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 05 10060 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area6.4 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start27 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start58.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"61.2 ft. FM - Fracture Multiple, from 07 to 01 o'clock, within 8 inches of joint: YES121.8 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES133.8 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"210.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 6"283.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 6"333.4 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Finish333.5 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish334.6 ft. AMH - Downstream Manhole, Survey Ends - 05 1005334.6 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK

Observation photos (4)

  • Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.4 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Settled Other,  10 %of cross sectional area, at 06 o'clock,  , within 8 inches of joint: YES, Start

    27 ft. - Deposits Settled Other, 10 %of cross sectional area, at 06 o'clock, , within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 01 o'clock, within 8 inches of joint: YES

    61.2 ft. - Fracture Multiple, from 07 to 01 o'clock, within 8 inches of joint: YES

  • Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES

    121.8 ft. - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES

Observations (17)

DistanceCodeObservation
0MGOCONNECTION AT MH 9 O'CLOCK
0AMH05 1006
0MWM
58.4TFC
210.5TF
334.6AMH05 1005
283.1TFC
0MGOCONNECTION AT MH 3 O'CLOCK
61.2FM
334.6MGOCONNECTION AT MH 9 O'CLOCK
0MWL
27DSZ
6.4CM
333.5CM
333.4DSZ
121.8FC
133.8TFC

Properties (4)

additional_info
SC359345
custom_field_two
3
customer
LACSD
datetime
2018-06-04T23:15:06-07:00