F 0032_F 0031_6212018_032810.mp4
2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - LONG & CIRCUM REBAR
2 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00
15 ft. - Surface Reinforcement Corroded, from 12 to 04 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
40 ft. - Surface Reinforcement Corroded, from 10 to 04 o'clock, within 8 inches of joint: YES - CORODED MISSING REBAR
79.3 ft. - Surface Reinforcement Corroded, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR
89.9 ft. - General Observation - MAG COAT 70% FINISH
129.7 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
183.5 ft. - Surface Reinforcement Corroded, from 08 to 01 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
285.3 ft. - Surface Reinforcement Corroded, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - LONG & CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 79.3 | SRC | LONG REBAR |
| 40 | SRC | CORODED MISSING REBAR |
| 285.3 | SAM | SEVERE AGG |
| 129.7 | SRC | CIRCUM REBAR |
| 261 | TF | Active |
| 183.5 | SRC | CIRCUM REBAR |
| 2 | SAM | SEVERE AGG |
| 285.7 | AMH | 3:55AM |
| 0 | MWL | — |
| 2 | SRC | LONG & CIRCUM REBAR |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. OPEN STOPLOG IN PLACE |
| 285.3 | SRC | LONG & CIRCUM REBAR |
| 0 | MWM | — |
| 0 | AMH | 3:35AM |
| 89.9 | MGO | MAG COAT 70% FINISH |
| 15 | SRC | CIRCUM REBAR |
| 2 | MGO | MAG COAT 70% START 8:00 TO 4:00 |