- Date
- 06/19/2018
- W/O
- 0711162
- Weather
- Dry
- Operator/Surveyor
- SANTIAGO OBREGON
- Sewer ID
- Z01018
- PipeID
- P24410
- Time
- 8:44 AM
- Certificate
- U-1014-06022541
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0895
- Sewer Name
- 29 21ST STREET TRUNK
- City
- SIGNAL HILL
- Loc. details
- Light Highway
- Location Code
- C
- Use of Sewer
- Sanitary Sewer
- District
- District 29
- Page No.
- 03
- Purpose
- Capital Improvement Program Assesment
- Project
- 20180619SHO_21ST_STREET_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 8 in.
- Upstream MH
- 29 0372
- Downstream MH
- 29 0373
- Dir. of Survey
- Upstream
- Length Surveyed
- 46.5 ft.
- Total Length
- 46.5 ft.
- Structural Index
- 0
- Structural Quick
- 0000
- Structural Rating
- 0
- O&M Index
- 0
- O&M Quick
- 0000
- O&M Rating
- 0
- Overall Index
- 0
- Overall Quick
- —
- Overall Rating
- 0
Pipe schematic from manhole 29 0372 to 29 0373 Observation photos (1)

7 ft. - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"